Follow my blog with Bloglovin
Thursday , 17 August 2017
Breaking News

As Shinzo Abe Visits Next Month, A Crucial Step Towards India’s First Bullet Train

India’s first bullet trains that will race between Mumbai and Ahmedabad will soon get off the drawing board.

Japanese Prime Minister Shinzo Abe and Prime Minister Narendra Modi will lay the foundation stone for the trains next month that could run at speeds of 350 kilometre an hour.

The project is expected to be completed for the first ride in the next six years.

This bullet train saves journey time as it takes only 2hours between  Ahmedabad and Mumbai.

There are a total of 12 stations on the 508-km route – four of which are in Maharashtra and eight in Gujarat. 

Bullet train on this route would mostly, 92 per cent, run on elevated tracks.

The bullet train will start underground from the Bandra-Kurla Complex in Mumbai and travel 27 km through a tunnel in the sea before emerging over ground at Thane.

It is estimated to cost about Rs. 97,636 crore.

“The entire funding for this or more or less 85 per cent of this will come from the Japanese and that too on very soft terms, said Railways Minister Suresh  Prabhu. But other cities too are going to get faster trains. 

Mr Prabhu said his ministry had drawn up maps for high-speed corridors on different routes between Delhi, Kolkata, Mumbai, Chennai, Mysuru and Bengaluru that would let trains touch speeds of 350 km an hour.On other routes such as Chennai-Hyderabad and Chennai-Mysuru, there would be trains that travel at speeds ranging from 160 to 250 km.

For now, the minister conceded that India’s fastest trains – the Rajdhani and Duronto – were getting delayed because of heavy traffic on the lines. Some networks are operating at 160 per cent to 170 per cent of the capacity,” he said.

Comments are closed.

Scroll To Top
badge