Follow my blog with Bloglovin
Tuesday , 12 December 2017
Breaking News

NM Cabling Performs Upgrade and Refresh for Luxury Yachts

In preparation for the start of the European yachting season, NM Cabling is performing regular upgrade and maintenance work for a number of luxury yachts.

Each year NM Cabling runs extensive checks to all cabling, audio visual and IT systems to ensure they are in best shape for the season ahead.

Some of the specific works include:

• Wellesley and Wellesley II – Aboard the 56m Wellesley and 33m Wellesley II, NM Cabling will be conducting a thorough review of the overall Audio Visual, IT, WIFI and Cabling systems, with upgrades and replacements made where appropriate. The Wellesley is a two season yacht and therefore has the same checks at the start of both the European and Caribbean yachting seasons.

• Manifiq and Fiddlers Dream – On the 41m Manifiq and 22m Fiddlers Dream NM Cabling conducted extensive works to design the Audio Visual and IT systems. The equipment was then shipped for local installation by the on board technical team.

Gary Crilly, Director NM Cabling said “it’s nice to stay involved with these boats after we’ve done the initial installation work, going back each year to ensure that the systems are fully functional and up to date. This is usually a very busy period for us, but an exciting one as well.”

Comments are closed.

Scroll To Top
badge